Engine · Bi-temporal change segmentation

Delta: find what changed between two dates

Delta is the core change model. Given an aligned, masked pair of images, it outputs a change mask and turns it into polygons, each with an area and a confidence score. It is tuned to ignore seasonal crop and vegetation cycles and to keep the changes that matter on industrial and construction sites.

Beta NVIDIA technology: TensorRT, Triton Inference Server, TAO

How it works

  1. A Siamese encoder with shared weights extracts features from both dates; a transformer block relates the two feature maps before a lightweight decoder predicts change.
  2. Pretrained on public change-detection datasets, then fine-tuned on each design partner's areas using reviewer decisions as labels.
  3. Exported from PyTorch to ONNX and compiled to a TensorRT engine in FP16, with INT8 under evaluation; served with dynamic batching on Triton.
  4. Polygons below a minimum mapping unit are dropped; persistent changes are tracked across later passes so a change is only reported once.

Inputs and outputs

Inputs
An aligned scene pair and visibility mask from Align and Clear
Outputs
Change polygons (GeoJSON) with area in hectares, confidence and first-seen date; a change raster (COG)

NVIDIA technology

Delta uses TensorRT, Triton Inference Server, TAO. See the technology page for how it fits the wider GPU pipeline.

Status: Beta

What exists now. In beta on Sentinel-2 at 10 m resolution with our design partners' areas. Accuracy figures will be published after evaluation.

What comes next. A high-resolution variant for 0.3 to 1 m imagery and drone orthomosaics, and per-customer threshold calibration.

Limits: what it does not do

  • At 10 m resolution, changes smaller than about a few hundred square metres are unreliable and are filtered out.
  • Delta reports that something changed; naming the change is Label's job, and judging it is a person's job.

Read more

Shape Revisit with us

We are taking a small group of design partners: mining, infrastructure and project teams who will run Revisit on real areas of interest for 60 days and tell us where it falls short.

Become a design partner